Program
Technical Tour
Pacific Basin Nuclear Conference 2026
- In conjunction with KAP 2026
"Nuclear Energy for an AI-powered World"
April 22-24, 2026 / Busan, Republic of Korea | BEXCO
Technical Tours for Overseas KAP/PBNC Participant and INEX Exhibitor
| Course | Facility | Limited Space |
|---|---|---|
| 1 | KHNP Saeul Nuclear Power Plant (APR1400) | 25 |
| 2 | KORAD RadWaste Repository & KAERI Munmu Advanced Research Institute | 30 |
| 3 | Doosan Enerbility Changwon Plant | 30 |
| 13:00 | Assembly at Exhibition Hall 1 Entrance & Attendance Check |
| 13:00-14:00 | Depart for Saeul Nuclear Power Plant |
| 14:00-14:30 | Security Clearance |
| 14:30-17:00 | Technical Tour: Saeul Units 3 & 4 Construction Site and Unit 2 (Turbine Building → Main Control Room → Spent Fuel Pool) |
| 17:00-18:00 | Return to BEXCO |
Saeul Nuclear Power Site (Saeul NPS) serves as a major hub for Korea’s next-generation nuclear power program, overseeing both plant operations and ongoing expansion projects.
The site applies the Advanced Power Reactor 1400 (APR1400) design and reflects Korea’s accumulated expertise in nuclear engineering, safety management, and efficient plant operation, contributing to reliable and low-carbon power generation

| 13:00 | Assembly at Exhibition Hall 1 Entrance & Attendance Check |
| 13:00-14:20 | Depart for Munmu Advanced Research Institute |
| 14:20-15:10 | Institutional Briefing and Facility Tour |
| 15:10-15:20 | Transfer to KORADUIM (Visitor Center) |
| 15:20-15:30 | Security Clearance |
| 15:30-16:50 | Technical Tour: Underground Silos and Near-surface Disposal Facility |
| 16:50-18:00 | Return to BEXCO |

| 13:00 | Assembly at Exhibition Hall 1 Entrance & Attendance Check |
| 13:00-14:30 | Depart for Doosan Enerbility Changwon Headquarters |
| 14:30-15:00 | Security Clearance |
| 15:00-16:30 | Technical Tour: Forging Shop, Turbine Shop and Nuclear Shop |
| 16:30-18:00 | Return to BEXCO |
Doosan’s Changwon Plant spans approximately four million square meters and houses a comprehensive range of large-scale manufacturing workshops, including facilities for casting and forging, turbines and generators, nuclear components, boilers, and wind turbines. In addition, the site features key gas turbine production facilities, an R&D center, and its own private dock.
With fully integrated production infrastructure, the complex is capable of executing the entire manufacturing value chain—from raw material processing to final product assembly—within a single site.